Estimate for an insurance claim

Free · no registration

📐 Create an estimate for freePDF · LV/RU/EN · MeistarPro

An insurance estimate describes putting right the damage, not the work the client would like done — and that distinction decides whether the claim is paid in full.

Record before pricing

Photographs with a scale, measurements of the affected areas, and a date. Every line must trace back to a specific piece of damage; a line with no photographic counterpart raises questions about the whole document.

What to include

Strip-out and drying; reinstatement only to the previous condition; materials and labour priced separately, since insurers check material prices; access and protection; and adjacent areas where a finish cannot be repaired in part — justified with a note rather than left unexplained.

Improvement versus reinstatement is the usual dispute. If the client wants a better material, split the estimate into like-for-like reinstatement and a separate upgrade at their own cost.

Why estimates come back

Round sums with no quantities; work beyond the damage; areas that do not match the photographs; no company details or signature; and an unclear VAT position.

Requirements differ between insurers and policies — ask the client for the document list they were given. See also the bank estimate.

Frequently asked questions

How does it differ from a normal estimate?

It covers only making good the damage, with every line traceable to a specific defect.

Materials and labour separately?

Yes — insurers assess them separately and check material prices.

What if the client wants an upgrade?

Split the estimate: like-for-like reinstatement, and the upgrade separately at the client’s cost.

📐 Create an estimate for free

📚 Related pages

Estimate for a bank loanWhat an estimate attached to a renovation or construction loan application should contain.… Apartment renovation estimateHow to build an apartment renovation estimate: lines by room or by trade, units, hidden work in… Estimate templateA construction estimate template with every part explained: details, work table, overheads, pro… LBN 501-17: estimate forms and cost structureWhat LBN 501-17 is, who must follow it, which estimate forms it defines and how construction co…

Home ›

More MeistarPro tools

🧱 Construction calculators 🧾 Invoice generator 📄 Contract generator 📊 MeistarPro CRM

← Back to the estimate generator