Apartment renovation estimate

Free · no registration

📐 Create an estimate for freePDF · LV/RU/EN · MeistarPro

An apartment renovation estimate differs from a new-build one in a single respect: you never fully know what is behind the old finish. That is why both a line-by-line breakdown and a contingency matter here, and both go in from the start.

By room or by trade

By room (kitchen, bathroom, bedroom) is easier for the client to read and to phase. By trade (strip-out, electrics, plumbing, walls, floors) is easier for you to buy materials and run the crew. In practice the best structure is sections by trade with the room named in each line: "tiling, bathroom, 18 m²".

What the estimate usually covers

Strip-out and waste removal (the skip is its own line, not "included"), electrics counted in points and metres of chasing, plumbing, wall and ceiling preparation and finishes, floor levelling, waterproofing in wet areas and coverings, doors, and materials listed separately from labour with normed consumption and offcuts.

Always carry a contingency in an older building

Crumbling plaster under wallpaper, a rotten timber floor under lino, aluminium wiring in the walls — none of it is visible when you price the job. A 5–10% contingency, spent only against agreed actual work, is the honest answer.

Pricing a whole flat "per square metre" is marketing, not an estimate: two 60 m² flats in the same building can differ twofold. Quantities are quick to get from our construction calculators; a ready form is the Excel template.

Frequently asked questions

By room or by trade?

Sections by trade with the room named in each line works best for both the client and the crew.

How much contingency in an older flat?

Usually 5–10% of direct costs, shown as its own line and spent only against agreed actual work.

Should materials be separate from labour?

Yes — the client sees what they pay for, and a price change means recalculating one column, not the whole estimate.

📐 Create an estimate for free

📚 Related pages

Internal finishing estimateHow to build an internal finishing estimate: partitions, wall preparation, painting, tiling, fl… Plumbing works estimateHow to build a plumbing estimate: strip-out, supply and waste pipework, connections, fittings, … Electrical works estimateHow to build an electrical estimate: points, chasing by substrate, cabling, board, low-voltage … Demolition works estimateHow to build a demolition estimate: work by element, waste sorting, skips, structural elements …

Home ›

More MeistarPro tools

🧱 Construction calculators 🧾 Invoice generator 📄 Contract generator 📊 MeistarPro CRM

← Back to the estimate generator